Friday, February 25, 2011

Prostart Replacement Remote

SETOM public inquiry: Summary of additional comments from Public Inquiry HLEG

Inquiry SETOM :
Synthesis of HLEG additional comments following the review of records investigation February 24 to 3:15 p.m. to 5:15 p.m. by Jean Lelievre, Stanislas Sasiela and RĂ©mi Gicquel in the presence of Mr JP Allaire Commissioner investigator

- 2.1: Transfer Platform Waste Green:
We recall our lack of permanent abandonment of composting facilities provided for this purpose since the construction of the VTC Guichainville.
In addition to financial waste that will pass through 12 who 800t/an truck MTC to new composting centers.
What are the guarantees provided to residents on the absence of odor during storage of green waste on site in the open air for 5 days?
As already mentioned in all other projects under the survey we ask what are the preferred direct delivery to composting centers without transit through the SETOM.

- 2.3: Sorting of dry recyclable waste:
We support a maximum development of waste recycling,
We note that the increase in current capacity of 15 000 to 20 000 tonnes / year will be through change in the amplitude of time.

- 4.1.1: Transfer of bulky and inert DIB:
Why skips a total of 10 000 tonnes / year of bulky they pass by SETOM rather than direct to the final treatment centers?

- 4.1.2: Resumption of DIB:
We do not understand how one can recover 10,000 tons / year of industrial waste poured into the pit of the EVU (they would when soiled) and how to select the loader of incinerators?
Why not send these 10 000 tonnes by taking direct import external 15 000 tonnes / year planned to fill the vacuum oven?

- 4.1.3: Home of waste from small artisans:
no objection to carry 50 tonnes / month of hosting taxed inert small artisans.

- Biomass Boiler SETOM:
We favor the solution of the City of Evreux, which deals directly with the operator DALKIA that supports all related costs,
no additional commitment from the solution of SETOM for creating new buildings, purchase of 5 acres of land for security reasons, or pipeline construction route between SETOM and existing boiler.

February 24, Remi Gicquel.GEHN.

Monday, February 21, 2011

Comparison Boss Mt-2 And Ml-2 Pedals

biomass boiler SITUATION grotesque! The vocabulary

SETOM The subjects to citizens until February 25, 2011, a public inquiry into City Council regarding the construction Guichainville a biomass boiler designed to supply the heating of the Madeleine.

For its part the City of Evreux entrusts DALKIA (European leader in energy services) conducting a biomass boiler located in place of the existing boiler.

SETOM Why he committed in a transaction that is in competition with the city of Evreux his potential client??

Note that the SETOM must construct buildings for the boiler room and a large network of pipes between the boiler and SETOM existing Evreux.

Is there not a better use of our public funds, provided by the SETOM to fund this achievement? Especially since we just learned that the public meeting SETOM halve the power of its biomass boiler, taking into account competition with the city of Evreux.

technical documents submitted at the public inquiry which have 2 boilers no longer seem relevant. Implementation plans, buildings, annexes, offices do they not become oversized after division by nearly two power under the record of the public inquiry?


Wednesday, February 9, 2011

What Causes White Spots On Dogs Nose

waste.

The CNIID we moved to decipher the issues behind the vocabulary of waste: Waste

Name masc. (To deprive) Syn.: Junk, rubbish

Definition of the Environmental Code : any residue of a process of production, processing or use any substance, material, product, or more generally any movable property abandoned or that the holder intends to abandon.

Become a waste is the potential fate of any object or substance, for example: toxic, vegetable peelings, an aircraft carrier, bottle, etc..

A waste is a "trick" that its owner no longer wanted and that he "put aside" because he believes he no longer needed. The bin is thus the realization of the futility, more or less consistently, in different societies. In France, the futility and waste of resources weigh about 400 kg per year per capita. What is thrown is the end of a production process that has itself generated upstream of tons of waste ...


wastes are unloved and thus usually sent far from where they were dumped. But to no avail: it was nice to remove them, burying them underground or to burn them in ovens, they always remember us through various pollution but also by high bills .


The municipal waste management costs in effect a little over $ 4 billion per year to households. Invoice that we deal with tax or fee obediently .

The waste is therefore an undesirable gold ... today it is coveted by some, as it has become a source of profit on a global scale. Globalization has this magic that even the contents of dustbins traded markets more or less legal around the world. Even the mafia invest in this sector, sufficiently lucrative and far less risky than drug or human trafficking.


So we live in a society where waste continues to grow and to fuel profits of some firms, including major villains, who are building their empire on a pile of garbage, which benefits, as the saying goes, a captive market.

Waste, as explained by Veolia, has become a resource. But for whom and at what price?

Talk Greenwash
: N
om fem. - Anglicism, literally "green washing"-t. "Eco-laundering"
do not say "The best waste is not produced," but said "the best waste is one that allows me to do business."